Add to Favorites | Chinese
Position:home>Modern hotel>
N iron connects video order programme (VOD) project solution
From;    Author:Stand originally
Of short duration does not have setting of brief introduction project:

In recent years, the speed of the development of Internet is accelerated ceaselessly, make telegraphic operation business also faces more good luck and challenge. The competitive aggravate between the industry, make while telegraphic operation business is accelerating the laid of hardware network, increase oneself management capacity, besides the network rate that offers stable security, add new appreciation service, make one of main service items. Novel, stable rise in value serves, can stabilize existing user for telegraphic operation business not only, still can be in opportune opportune moment, create new profit drop for telegraphic operation business. Video order programme (VOD) , video living broadcast serves, it is telegraphic operation business is relatively at present commonly used one of appreciation services.

N iron connects the telegraphic operation business with much to have same development state, through the effort with enterprise long-term faculty, relatively stable market share is owned on local market, what business of its video order programme also begins is relatively successful, but the development that uses as Internet technology, with the grow in quantity of user amount, system of original video order programme appeared user management is intricate, film management is difficult, bottleneck of systematic bear capacity, the much face element such as difference of laden and balanced ability.

The system attacks develop graph:





Environmental configuration:

Operating system: Server end: Server edition of Windows 2000 Server/2003 / advanced server edition (include Internet information to serve (IIS) package, DirectX8.0 or above)

Client end: Windows 98/2000/XP/2003 (DirectX8.1 or above)

Database: Database of this systematic support Microsoft SQL Serve (use standard interface, can press need extension) .

Plan configuration:

(1) Www server (1) : × of Intel Xeon DP 3.0 2GHz CPU (1024K L2 Cache) , heat of memory of 1GB R-ECC DDR, 72G is inserted unplug the power source of card of net of fast aether of SCSI hard disk, 10/100/1000Mbps, 460W.

(2) shed media to serve a system (1) : × of Intel Xeon DP 2.8 2GHz CPU (1024K L2 Cache) , heat of memory of 1GB R-ECC DDR, 146G is inserted unplug the power source of card of net of fast aether of card of SCSI hard disk, Ultra320 Raid, 10/100/1000Mbps, 460W.

(3) shed media center memory: 3U frame type: 4200GB; 320MB/s; 8MB; Amount of 14 stand-alone disk (RAID5)

Driver of hard disk of 14 1 inch of SCSI U360; Driver of use 146GB1 hard disk, can store the data that amounts to 2044GB.

(4) administrative database system (1) : Intel Xeon DP 3.0*2GHz CPU (1024K L2 Cache) , heat of memory of 1GB R-ECC DDR, 72G is inserted unplug the power source of card of net of fast aether of SCSI hard disk, 10/100/1000Mbps, 460W.
Previous12 Next
About us | Legal Notices | Sitemap | Links | Partner